U.S. Spacewalk 98

NASA
Loading transcript... Click for full transcript
About this episode NASA astronauts Neil Menon and ESA astronaut Sophie Adeno successfully completed Spacewalk 98, a 6.5-hour EVA … AI summary

NASA astronauts Neil Menon and ESA astronaut Sophie Adeno successfully completed Spacewalk 98, a 6.5-hour EVA to install a replacement Space-to-Ground Antenna (S-Gant) on the ISS Z1 truss, restoring full communications redundancy. The mission involved complex robotic arm operations, precise bolt installation, and troubleshooting a suit mobility issue, demonstrating high team resilience and technical proficiency.

Key takeaways 4
  • The S-Gant replacement was a two-phase operation: the first EVA on August 18th removed the failed unit, while this EVA focused on installing the spare from External Stowage Platform 3 and stowing the failed unit permanently.
  • The EMU spacesuit operates at 4.3 psi compared to the station's 14.7 psi, necessitating a pre-breathe protocol (mask pre-breathe with 100% oxygen followed by in-suit light exercise) to purge nitrogen and prevent decompression sickness.
  • The installation required meticulous torque specifications (e.g., 19.2-20.2 ft-lbs) and multiple wiggle tests to ensure bolts were flush and secure, highlighting the precision required for critical hardware installation.
  • A suit mobility issue occurred with Sophie Adeno's left shoulder joint due to a power harness wrapping around the axial restraint; this was resolved by loosening the harness, demonstrating effective real-time troubleshooting.
Notable quotes 3 AI-generated: wording and quote attribution may be wrong. Use the play link to verify.
  • “It's a small toothbrush for an antenna and a giant leap for communication redundancy.”
    ▶ 7:48:10 Sophie Adeno's humorous summary of the meticulous cleaning and installation process required for the antenna.
  • “Never underestimate what humanity can achieve when we work together... keep dreaming, building bridges.”
    ▶ 7:48:44 Sophie Adeno's closing remarks emphasizing international cooperation and inspiration for future generations.
  • “Our success is a result of you... it's the resiliency that we have to not give up that makes this a success.”
    Flight Director Chris Dobbins acknowledging the team's perseverance through technical challenges.

Chapters & Sections (165)

1:30 Spacewalk 98 Pre-Breathe Protocol and Suit Checks chapter 4
3:43 Antenna Issues and Pre-Breathe Protocol
6:20 Airlock Checks and Camera Verification
8:14 Spacewalk 98 Crew Roles and Communications
10:23 Spacewalk 98 Crew and Mission Control Roles
13:37 EMU Spacesuit Systems and Prebreathe Protocol chapter 1
17:15 EMU Life Support and Prebreathe Protocol
22:42 Quest Airlock Depressurization and Suit Prep chapter 1
26:28 Suit Prep and Signal Loss
29:44 ISS Spacewalk Antenna Replacement Procedure chapter 2
31:46 Spacewalk Setup and Canadarm2 Operations
34:07 Spare Antenna Installation and Failed Unit Retrieval
35:57 Spacewalk 98 Antenna Replacement and Airlock Prep chapter 2
37:41 SAFER Suit Explanation and Airlock Entry
39:58 Quest Airlock Depressurization Process
46:45 Spacewalk Preparation and Suit Pressure Checks chapter 2
48:42 EV2 Suit Pressure Verification
50:27 Crew Lock Depressurization Procedure
53:26 ISS Spacewalk 98 Depressurization Process chapter 1
56:59 Spacewalk 98 Pre-EVA Suit Checks
1:01:38 ISS Crew Lock Depressurization and Suit Checks chapter 1
1:06:27 Crew Lock Depressurization to Vacuum
1:10:19 Spacewalk Tether Configuration Verification chapter 1
1:12:30 Tether Configuration Verification and Status
1:15:21 ISS Spacewalk Pre-Egress Procedures chapter 1
1:20:13 Spacewalk Overview and Depressurization
1:22:41 Spacewalk Pre-EVA Checks and SGA Replacement chapter 1
1:26:50 EV Hatch and Power Switch Verification
1:30:06 Spacewalk Suit Checks and Egress Preparation chapter 1
1:32:41 Suit Checks and Airlock Egress
1:36:50 Spacewalk Initiation and Equipment Stowage chapter 2
1:38:54 Spacewalk Start and Tool Preparation
1:41:51 Body Restraint Tether and SAFER Equipment
1:44:13 Spacewalk Buddy Checks and Translation Setup chapter 1
1:46:38 Thermal Cover Closure and Buddy Check Verification
1:50:50 Spacewalk Buddy Checks and Robotic Arm Setup chapter 1
1:54:48 Apfr Retrieval and Handoff Procedures
1:57:07 Installing APFR on Canadarm2 chapter 2
1:58:56 Tether swaps and handrail stowing
2:03:25 APFR Installation and Configuration
2:06:47 Robotic Arm Maneuver and EVA Translation chapter 1
2:10:47 Robotic Arm Setup and Translation Instructions
2:12:12 Translation to External Stowage Platform Three chapter 1
2:15:52 Navigating Diagonal Path to Stowage Platform
2:18:32 Spacewalk Navigation and SP3 Approach chapter 2
2:21:12 Robotic Arm Maneuvering to SP3
2:23:00 Spacewalk Communication and SP3 Arrival
2:25:02 SP3 Bolt Torque Break Procedure chapter 3
2:27:29 Ramp Out and Bolt Removal Preparation
2:28:55 Body Position and Bolt Torque Instructions
2:30:42 Releasing Second SSFS Bolt
2:33:06 Releasing and relocating spare antenna chapter 4
2:35:42 Releasing S-band antenna bolts
2:38:04 Antenna stabilization and bolt release preparation
2:39:59 Releasing spare antenna and robotic arm positioning
2:46:22 Coordinating robotic arm translation and antenna reorientation
2:47:56 Spacewalk Antenna Installation Maneuvers chapter 2
2:52:12 Robotic Arm Maneuvers and Tether Management
2:54:57 Satellite Handover and Robotic Arm Maneuver
2:56:30 Spacewalk Antenna Installation and Translation chapter
3:03:10 Spacewalk Stowing Bags and Preparing Antenna Installation chapter 1
3:06:21 Z1 Truss Stowing and Boom Prep
3:11:23 Boom Bolt Lubrication and Cleaning chapter 1
3:15:37 Lubricating Bolt Three and One
3:21:23 Grease Application and Cleanup for Spare Antenna chapter 1
3:24:00 Cleanup and Preparation for Antenna Installation
3:27:34 Spacewalk Spare Antenna Installation chapter 2
3:31:40 Spare Antenna Installation Preparation
3:33:47 Robotic Arm Maneuvering for Antenna Install
3:35:39 Scanner Installation and Bolt Torque Procedures chapter 1
3:37:46 Scanner Alignment and Bolt Torque
3:40:38 Installing Spare S-Band Antenna on Z1 Truss chapter 2
3:46:44 Securing Bolt Four on Antenna
3:48:31 Troubleshooting Bolt Four Installation
3:50:46 Spacewalk Bolt Alignment and Removal chapter 2
3:53:45 Bolt Turn Verification and Ret Removal
3:56:11 Handle Positioning and Alignment
3:58:32 Spacewalk Bolt Torquing Procedures chapter 3
3:59:53 Torquing Bolt One Bravo One
4:02:21 Bolt Torque Verification and Flush Check
4:05:43 Torquing Starboard Bolt Four
4:07:47 S-Band Antenna Bolt Installation and Torque chapter 2
4:10:33 S-Band Antenna Bolt Torque Verification
4:13:36 Bolt Four Starboard Torque Verification
4:15:25 Spacewalk Bolt Inspection and Cable Mating chapter 1
4:19:12 Quarter Turn Fastener and Boom Connector Removal
4:21:51 Spacewalk Connector Mating and Alignment chapter 1
4:23:58 Connector Mating Alignment Troubleshooting
4:30:05 Spacewalk Bolt Installation and Alignment chapter 2
4:33:37 Installing J7 Cap and Torquing Bolts
4:36:01 Bolt Turn Verification and Options
4:39:35 Torquing Bolts One and Two chapter 2
4:42:09 Torquing Bolt Two Aft
4:44:15 Torquing Bolt Four with T Handle
4:46:49 Antenna Bolt Wiggle Test and Torque Wrench Retrieval chapter 1
4:48:59 Torque Wrench Retrieval and Bolt Seating
4:52:41 Torqueing bolts and removing gimbal locks chapter 1
4:56:13 Retrieving RET and Gimbal Lock Setup
5:02:17 Spacewalk Setup and Gimbal Lock Release chapter 2
5:04:44 Antenna Installation and Clearance Checks
5:06:29 Preparation for Gimbal Lock Removal
5:08:49 Releasing Gimbal Lock Bolts on ESS Gantry chapter 2
5:11:36 Releasing Gimbal Lock Bolts Mike, Kilo, Hotel
5:14:43 Preparing for Bolt Echo Removal
5:16:09 Releasing Gimbal Lock Bolts and Repositioning chapter 3
5:19:07 Torque Wrench and Positioning Instructions
5:20:40 Initial 30cm Headward Motion and Bolt Alpha Setup
5:22:14 Counting and Releasing Gimbal Bolts
5:24:46 Removing Gimbal Locks on Z1 Truss chapter 2
5:28:26 Tool Management and Gimbal Locks
5:30:08 Handing Off Control During Spacewalk
5:32:19 Torque bolts and install heat shield chapter 2
5:35:33 Gimbal lock wiggle test
5:37:44 Installing heat shield strap and fasteners
5:40:28 Z1 Tie Down Removal Assist Positioning chapter 2
5:43:36 Body Up Movement and Clearance Check
5:45:23 Antenna Installation and Body Motion
5:47:10 Installing spare antenna and retrieving failed unit chapter 1
5:49:57 Retrieving failed antenna and securing tethers
5:54:02 Resolving Awkward Spacewalk Tethering Positions chapter 3
5:57:17 Optimizing Body Positioning for Hook Access
6:00:14 Mastering Spacewalk Foot Positioning
6:02:19 Handing Off Control and Z1 Back Off
6:06:23 Relocating S-Gant Antenna to SP3 chapter 1
6:08:41 Cleanup and Antenna Verification Procedures
6:12:32 Spacewalk Tool Inventory and Cleanup chapter 1
6:16:55 Translating to Airlock and Stowing Tools
6:21:35 Spacewalk Progress and Video Loss chapter 1
6:28:34 Spacewalk Motion and Communication Checks
6:33:55 SP3 Bolt Access and Clearance Procedures chapter 1
6:36:26 SP3 Bolt Access Positioning and Timing
6:41:01 Installing Spare and Failed S-Band Antennas chapter 1
6:44:18 Installing Failed S-Band Antenna on ESP3
6:48:32 Antenna Installation and Robotic Arm Cleanup chapter 1
6:52:09 Antenna Installation Completion and Cleanup
6:54:33 APFR Pick Up and Ingress Preparation chapter 2
6:59:11 Brake Pedal and Positioning Instructions
7:03:31 Positioning for Apfr Egress Maneuver
7:05:36 Apfr retrieval and tether swap procedures chapter 9
7:08:49 Apfr retrieval and tether swap procedures
7:10:17 HECO view and tether swap steps
7:14:04 Left shoulder stiffness and tether management
7:16:21 Coordinating arm movement and APFR handoff
7:18:31 Suit joint movement and tether release
7:20:11 Translation coordination and tether management
7:26:25 EMU Suit Mobility Assessment
7:29:14 Airlock ingress and bag transfer
7:31:27 Final cleanup and ingress procedures
7:33:14 Spacewalk Airlock Ingress and Tether Procedures chapter 2
7:35:28 Tether Configuration and Airlock Ingress
7:37:27 EV1 Anchor Hook Stowage and Personal Note
7:39:40 Spacewalk Conclusion and Team Recognition chapter 3
7:44:04 Airlock Closure and Video Dish Recognition
7:46:06 Mission Success and Team Appreciation
7:47:48 Team Appreciation and Future Inspiration
7:49:14 Spacewalk Hatch Closure and Re-pressurization chapter 1
7:53:58 EMU Power and O2 Actuator Checks
7:57:50 ISS Spacewalk 98 Repressurization and Summary chapter 1
8:01:28 Antenna Swap and Repressurization Progress
8:09:05 Airlock Re-pressurization and Spacewalk Conclusion chapter 1
8:15:20 Spacewalk Conclusion and Antenna Replacement
8:27:17 Troubleshooting Suit Shoulder Joint and Antenna Installation chapter 3
8:32:32 Airlock Hatch Operations and Suit Safety Removal
8:38:18 Assessing Shoulder Joint Restraint and Cable
8:42:13 Spacewalk 98 Completion and Antenna Installation

Transcript

Loading transcript...